Loading Comparison
Fetching pricing data and provider information...
Compare GPU pricing between Cudo Compute and Voltage Park. Find the best rates for AI training, inference, and ML workloads.
Provider 1
Provider 2
Average Price Difference: $0.20/hour between comparable GPUs
| GPU Model ↑ | Cudo Compute Price | Voltage Park Price | Price Diff ↕ | Sources |
|---|---|---|---|---|
A100 PCIE 40GB VRAM • Cudo Compute | Not Available | — | ||
A100 PCIE 40GB VRAM • | ||||
H100 SXM 80GB VRAM • Cudo ComputeVoltage Park | ↓$0.20(10.1%) | |||
H100 SXM 80GB VRAM • $1.79/hour Updated: 9/12/2026 ★Best Price $1.99/hour Updated: 9/12/2026 Price Difference:↓$0.20(10.1%) | ||||
L40S 48GB VRAM • Cudo Compute | Not Available | — | ||
L40S 48GB VRAM • | ||||
A100 PCIE 40GB VRAM • Cudo Compute | Not Available | — | ||
A100 PCIE 40GB VRAM • | ||||
H100 SXM 80GB VRAM • Cudo ComputeVoltage Park | ↓$0.20(10.1%) | |||
H100 SXM 80GB VRAM • $1.79/hour Updated: 9/12/2026 ★Best Price $1.99/hour Updated: 9/12/2026 Price Difference:↓$0.20(10.1%) | ||||
L40S 48GB VRAM • Cudo Compute | Not Available | — | ||
L40S 48GB VRAM • | ||||
Explore how these providers compare to other popular GPU cloud services
Compare Cudo Compute with another leading provider
Compare Cudo Compute with another leading provider
Compare Cudo Compute with another leading provider
Compare Cudo Compute with another leading provider
Compare Cudo Compute with another leading provider
Compare Cudo Compute with another leading provider
Dedicated access to NVIDIA GPUs including GB300, B300, VR200, GB200 NVL72, HGX B200, H200, and H100 in SXM and PCIe form factors
Multi-node GPU clusters for training and inference, commissioned to acceptance criteria before entering production
Infrastructure across the UK, EU, North America, APAC, and the Middle East with in-region options for latency, residency, and regulatory needs
Foundational SRE included as standard with 24/7 monitoring, incident response, firmware management, and NVIDIA escalation paths
REST API and documented workflows for provisioning, scaling, and lifecycle automation
Controlled environments for enterprise and regulated workloads with jurisdictional control and sovereign data residency enforcement
NVIDIA HGX H100 GPUs in Dell PowerEdge XE9680 servers with 1TB RAM and v52 CPUs
Six U.S.-based data centers with redundancy, availability, and reliability across power, cooling, network, and security
NVIDIA Quantum-2 InfiniBand network with up to 3,200Gbps of aggregate bandwidth for high-speed communication
Direct hardware access for maximum performance without virtualization overhead
Integrated platform of prebuilt blueprints — image, video and podcast generation, agentic RAG, spreadsheet analysis, SAM3 image/video segmentation, markdown conversion — plus a model playground
Bare-metal access, managed Kubernetes, and virtual machines to match different workload needs
On-demand and reserved GPU VMs with configurable vCPU, memory, and storage.
Dedicated multi-node GPU clusters for high-performance training and inference.
InfiniBand and Ethernet fabrics with high-performance storage for cluster workloads.
Self-serve GPU instances available in minutes with no long-term contracts
Long‑term GPU reservations with favorable payment terms; H100 and Blackwell options.
Hourly per-GPU billing for virtual machine instances with no commitment
GPU systems in the published catalog are priced on request, with enquiries handled by the sales team
Consumption-based commercial structures for predictable spend on long-term deployments
Multi-year structures with defined upgrade paths across GPU generations and into multi-site environments
Self-serve, pay-as-you-go bare-metal H100 nodes on Ethernet with no minimum term
Self-serve, pay-as-you-go bare-metal H100 nodes on 3,200 Gbps InfiniBand with no minimum term
Dedicated reserved capacity on 6+ month contracts with negotiated payment terms; the only route to Blackwell systems
Submit an enquiry from the pricing or contact page describing your workload, capacity, and region requirements.
Select a jurisdiction in the UK, EU, North America, APAC, or the Middle East to meet latency, residency, and compliance needs.
Cudo produces an NVIDIA reference-aligned architecture covering InfiniBand fabric, storage, power, cooling, and rack layout.
Systems are sourced through OEM channels including Dell, Lenovo, Supermicro, and HPE, then installed at power-ready sites against confirmed timelines.
Clusters are commissioned to acceptance criteria and operated with 24/7 monitoring, incident response, and firmware management.
Sign up for Voltage Park services through their website
Select between on-demand access or long-term reservation
Specify the number of GPUs and networking requirements
Launch your cluster and access via SSH or preferred tools
Global infrastructure across UK, EU, North America, APAC, and Middle East with ISO 27001-certified facilities and sovereign data residency options
Enterprise SLAs with 24/7 infrastructure monitoring, L3 incident response, and lifecycle operations delivered by NVIDIA-certified engineers; sales and technical enquiries via the contact page.
Six Tier 3+ designed data centers across four U.S. states
24/7 expert support included at no extra cost; self-serve help center at support.voltagepark.com (also reachable at docs.voltagepark.com); infrastructure partnership with Penguin Solutions for setup and optimization